As the expansion of power grid infrastructure lags behind the rapid growth of renewable energy generation facilities, curtailment of solar power plants has become increasingly frequent. Curtailment is no longer just a temporary operational inconvenience; it has become a critical variable determining the commercial profitability and financing of power plants.

In a contributed article, Attorney Sungwoo (Goni) Kim of SOLARIS analyzed the significance of recent court rulings surrounding curtailment and outlined key contractual check points that power generation operators should keep in mind.

  • (Legal Nature) The court dismissed an administrative lawsuit by determining that curtailment is not an administrative disposition, but rather an act governed by the transmission and distribution service agreement with KEPCO. Accordingly, the appropriateness of the curtailment criteria and potential discrimination must be challenged through civil litigation as a breach of contract.

  • (Securing Evidence) To argue whether a curtailment measure exceeded the minimum necessary extent, operators must directly maintain records of the notifications received and power generation data before and after each curtailment for each power plant.

  • (Allocation of Contractual Risks) In EPC or O&M contracts, unless the burden of losses resulting from curtailment and the risks of regulatory changes are clearly allocated, such damages will ultimately fall on the power generation operator.

  • (Cautions for Flexible Interconnection) When entering into a flexible interconnection agreement that increases the interconnection capacity limit, it is essential to verify in advance whether the annual curtailment limit and specific grounds are clearly stated in the contract terms.

In step with changes in the renewable energy sector and power market frameworks, SOLARIS offers practical solutions to regulatory and contractual disputes faced by power generation operators and investors.

  • Original Contributed Article: [Op-Ed] Solar Curtailment: Dispute via Contract Claims, Not Administrative Litigation

As the expansion of power grid infrastructure lags behind the rapid growth of renewable energy generation facilities, curtailment of solar power plants has become increasingly frequent. Curtailment is no longer just a temporary operational inconvenience; it has become a critical variable determining the commercial profitability and financing of power plants.

In a contributed article, Attorney Sungwoo (Goni) Kim of SOLARIS analyzed the significance of recent court rulings surrounding curtailment and outlined key contractual check points that power generation operators should keep in mind.

  • (Legal Nature) The court dismissed an administrative lawsuit by determining that curtailment is not an administrative disposition, but rather an act governed by the transmission and distribution service agreement with KEPCO. Accordingly, the appropriateness of the curtailment criteria and potential discrimination must be challenged through civil litigation as a breach of contract.

  • (Securing Evidence) To argue whether a curtailment measure exceeded the minimum necessary extent, operators must directly maintain records of the notifications received and power generation data before and after each curtailment for each power plant.

  • (Allocation of Contractual Risks) In EPC or O&M contracts, unless the burden of losses resulting from curtailment and the risks of regulatory changes are clearly allocated, such damages will ultimately fall on the power generation operator.

  • (Cautions for Flexible Interconnection) When entering into a flexible interconnection agreement that increases the interconnection capacity limit, it is essential to verify in advance whether the annual curtailment limit and specific grounds are clearly stated in the contract terms.

In step with changes in the renewable energy sector and power market frameworks, SOLARIS offers practical solutions to regulatory and contractual disputes faced by power generation operators and investors.

  • Original Contributed Article: [Op-Ed] Solar Curtailment: Dispute via Contract Claims, Not Administrative Litigation

30th Floor, ASEM Tower, 517 Yeongdong-daero, Gangnam-gu, Seoul

Representative

Park Soojin

Copyright © 2026 SOLARIS. All Rights Reserved.

EN

30th Floor, ASEM Tower, 517 Yeongdong-daero, Gangnam-gu, Seoul

Representative

Park Soojin

Copyright © 2026 SOLARIS. All Rights Reserved.

EN

30th Floor, ASEM Tower, 517 Yeongdong-daero, Gangnam-gu, Seoul

Representative

Park Soojin

Copyright © 2026 SOLARIS. All Rights Reserved.

EN